What we are building

Three efforts at day zero, with the date we would stop each one.

None of these is a product yet. Each has a written problem, an intended operator, and a kill date — the day we archive it if the one thing it must prove has not happened. Publishing the kill date is the point: it is what stops an idea outliving its evidence.

LegalEngineering

Day zero

A durable index and chronology for document-heavy case work, so exhibits and timelines are found rather than rebuilt.

Intended for
Ourselves first, on one real matter. Chambers only after internal use has proved it.
State today
Day zero. A written definition and a first task list exist. No software has been built.
We stop it on
19 October 2026if the index and chronology are not in weekly use on that matter by then.

UrjaOps

Day zero

A register that shows which solar site is blocked on which filing or document, without ten folders and a message thread.

Intended for
Operations leads at EPCs and aggregators, who track this today in spreadsheets, shared drives and field calls.
State today
Day zero. A written definition and a first task list exist. No software has been built.
We stop it on
19 November 2026if no operator has put a real site list into the register and confirmed it does the job of their weekly spreadsheet.

EduOS

Day zero

A way for cohort operators to prove completion with evidence, instead of reconstructing it from spreadsheets afterwards.

Intended for
Training leads and small education teams, who chase this today through spreadsheets and messages.
State today
Day zero, and deliberately parked: no build work begins until a named design partner exists. Attention is finite and two other efforts rank ahead of it.
We stop it on
19 November 2026if no design partner has committed by then.

If one of these describes a problem you have, the contact page reaches a person.